ERP Internals/Modules/Manufacturing/Bill of Materials/Functions/Maintain Bill of Materials
Each line should be filled with Item Code, Quantity, Plan Scrap Quantity, Operation and Effective Date The BOM should avoid infinite loop. The ERP system should cover the function to detect the loop.