The science of finance/Probabilities and evaluation of risks

Probabilities in economics edit

To give an objective meaning to a probability, it is necessary and sufficient that it be measurable. For that it is necessary and sufficient that an experiment be reproducible. By reproducing the same experiment many times, the probabilities of its results are measured from their frequencies of appearance. But in economics experiments are never reproducible. Each economic event is unique. All agents are always different, and the conditions in which they are placed are never exactly the same. Therefore, there can be no objective meaning for economic probabilities. But probabilistic models are of fundamental importance for economics. Where is the error? Are probabilistic models in economics always false because the probabilities in economics have no objective significance?

The uncertainty of games of chance can be considered purely probabilistic, provided they are not faked, because they are generally reproducible experiments. Economic uncertainty is not strictly probabilistic, but economic decision-making about risk is very similar to gamblers' decision-making. When we face a risk, we reason as if we made a bet with reality. When we attribute probabilities to expected economic events, they can never be true and accurate, but they can still be estimates that make better decisions. An insurance company, for example, must estimate probabilities of death. It does so from the statistics of recorded deaths. If it did not do so, it would not be able to anticipate its payment obligations and it would run the risk of bankruptcy.

Probabilistic models in economics can never be strictly true, but they may be sufficiently similar to reality to merit comparison. All that is needed is a relevant analogy to justify a model. And models can be useful even when they are very wrong, because the gap between the model and reality can be very significant.

The measurement of risk edit

Risk is commonly referred to as a measurable magnitude: the risk is zero in a situation of certainty and increases when uncertainty increases. The ratio of the standard deviation to the average profit of a project is often a good measure of its risk because it increases with uncertainty and because it makes it possible to compare projects of different average profits. But a single magnitude can never suffice to account for the diversity of risks. Standard deviation measures the spread of a probability distribution, but the shape of this distribution is also important for assessing risk. It determines the distribution of probabilities between very high and moderate gains and moderate and very high losses. The standard deviation measures spread, but it does not say anything about the diversity of forms. It is therefore useful especially for comparing distributions of the same form. If for example two distributions are normal (gaussian), the riskiest is clearly the one with the greatest standard deviation. But if distributions have different forms, comparing their standard deviations is not necessarily a good way to compare their risks. In addition, the standard deviation is not the only quantity that measures the spread of a distribution. The mean of the absolute values ​​of the deviations from the mean is sometimes a more natural estimate of the spread than the square root of the mean of the squares of the deviations from the mean, which places great importance on the large differences to the detriment of the small ones.

When we measure the spread of a distribution, we make an average both on the chances of winning, when the return is above its average, and on the chances of loss, when it is lower. The risks of loss are particularly important when one questions the viability of a company or project. We are particularly attentive to the left side of the probability distribution, while the spread of the right side, the chances of winning, does not inform us.

Value at risk, is an indicator of a risk of loss widely used to study the viability of companies.

The p value at risk of a random variable   is by definition the number   such that  . The positive values of   are profits, the negative ones are losses.

  is the probability that  .   is the cumulative distribution function of the random variable  .   where   is the probability density of  .

 

 

The value at risk makes it possible to estimate the loss that may be incurred. We know that with a probability  , the loss will not be greater than  .   is usually a small number,   or less. Losses that have a probability lower than   can be considered extraordinary losses. The value at risk is used to estimate the maximum amount of ordinary losses, but it does not say anything about extraordinary losses. If losses have a probability lower than  , they have no influence on  . Two companies, one of which is exposed to gigantic but rare losses, and not the other, may have the same value at risk.

Risk indicators such as standard deviation, or the mean of absolute values ​​of deviations from the mean, or the value at risk, can never provide complete information on the risks to face. It is necessary to know the probability density of the expected profits and losses, or in an equivalent way their cumulative distribution function, to be completely informed on the risk.

The price of risk edit

In general, it is believed that risk decreases the value of a project. The risks of low profit and especially loss are generally dissuasive, even if the chances of a high profit make that the average profit is substantial. Of two projects that have the same average profit, the riskiest is usually the least valuable. This decrease in value is a risk premium. In order for a risky project to be attractive, it must generally yield more than the risk-free interest rate, it must have a sufficient average profit to offset risk taking. The risk premium can be calculated from the surplus profit rate required to offset the risk, ie the difference between the required rate of profit and the risk-free interest rate.

Risk aversion is not universal. There are many exceptions. The risk may not diminish the value of a project but instead be sought for itself. In most games of chance, for example, one always loses on average, the average profits are negative, but even very small chances of a large gain are enough to convince the gamblers to participate. The value they attribute to the sought risk offsets their average loss.

Since economic agents are not equal in the face of risks, they evaluate them very differently. This promotes risk trading. The same risk that is very dissuasive for one agent may be very little for another. The second then has an interest in selling the first one a guarantee against risk.

Discounting uncertain projects edit

A risk-adjusted discount rate is sometimes defined by adding to the risk-free discount rate the surplus profit rate which measures the risk premium. But to calculate the net present value of an uncertain project, this definition makes sense only if there is only one initial cost and one final revenue. If there are uncertain losses, it is obviously foolish to depreciate them with a higher discount rate than the risk-free rate. And when uncertain payments are staggered over time there is usually no reason to discount them with the same risk-adjusted discount rate because they may have very different uncertainties.

The discount rate is the risk-free interest rate. It is estimated from the investment rates considered safe but this does not prevent it from being applied to the evaluation of uncertain projects. It is an exchange rate between the money paid today and the money paid later, a time exchange rate. That a project is certain and risk-free or very uncertain and very risky should not change anything in the way of discounting the payments. To evaluate risky projects, all revenues and costs must be discounted at the risk-free investment rate, because this is the best way to add payments staggered over time. Whether or not these payments were predicted with certainty or not does not change the case. The discount rate depends on the economic reality at a given moment, not the projects to which it is applied. It is the same for all projects facing the same reality, whether they are risky or not.

If a project is risky, and if the probabilities of revenue and costs are known, we can calculate with the true discount rate, not a risk-adjusted rate, an average discounted value of revenues, cash advances and other costs, and therefore an average profit, an average profit rate and an average net present value, but this is not the net present value of the project, because it does not take into account the risk premium.

The net present value of an uncertain project is its average net present value minus the risk premium. The risk premium is the present value of the average surplus profit required to offset the risk. It is the present value of the difference between the average profit required and the profit that would be obtained if one placed one's capital at the risk-free interest rate. Since the average net present value is the present value of the average surplus profit, the net present value of an uncertain project is the present value of the difference between the average surplus profit and the surplus profit required to offset the risk, hence the present value of the difference between the average profit and the profit required to offset the risk.

Statistical independence, anticorrelation and risk reduction edit

There are two techniques to reduce risk. One makes use of the statistical independence of economic events, the other their anticorrelations.

  • When many projects are statistically independent, their sum is much less risky than each individual project. A simple example suffices to be convinced: if   statistically independent projects have the same expected average profit   with the same standard deviation  ,   measures the risk of an individual project. Their sum has a mean expected profit   with a standard deviation  , because the variance of a sum of independent variables is the sum of their variances. The risk of the sum of all projects is therefore measured by   which approaches zero if   is very large. In general, projects do not have the same expected average profits or the same risks, but if they are statistically independent, the risk of their sum is generally much lower than the risk of each of them taken in isolation, and approaches zero when the number of projects is very large.
  • Two projects are anticorrelated, or negatively correlated, when the success of one is correlated with the failure of the other. The covariance of their profits is negative. For example, the price rise of a stock is correlated with the decline in the value of a put option on that stock. Positive and negative correlations between the values ​​of assets and corresponding options result in risk-free portfolios that form the basis of option pricing methodology of Merton, Black and Scholes presented later. Positive correlations can be used by betting down, which can be done by selling short, buying put options or selling calls. Selling short is selling shares that have been borrowed by committing to buy them later to return them. Risk hedging strategies generally involve betting at the same time on the increase of certain assets and the decline of other assets. But assets are often positively correlated, their values ​​often increase or decrease at the same time. The rise of some is therefore often anticorrelated with the decline of others. Hedging strategies therefore reduce the risks associated with changes in the value of assets. One tries to win on both counts, both when the market is rising and when it is falling.

The casino economy edit

A project is usually affected by many uncertain events that can increase or decrease its profit. Two types of events must be distinguished, those that affect only the current profit of the project, unforeseen costs or revenues that momentarily affect the profit of a project but have no influence on its future profits, and those that permanently affect the project's ability to make a profit. The effects of events of the first type must be added to obtain their cumulative effect, while those of the second type must be multiplied.

Suppose that a project is affected only by events of the second type: many random events   can influence its value   during a time interval  . Each event   if it occurs multiplies   by a factor   if it promotes the success of the project and   if it is unfavorable. We assume that the events   have probabilities   and that they are independent. The variation of   is then a sum of random variations  . According to the central limit theorem, if these variations are very numerous, small compared to their sum and independent, the distribution of probabilities of this sum is a normal law. Let   be its average and   its variance. If the project environment is constant,   and   do not depend on  . On a time  , the variation of   then follows a normal distribution of mean   and variance  .

Let   be the initial value of the project. Since   follows a normal distribution of mean   and of variance  ,   follows a log-normal law whose probability density is:

 

The average value of   is   and its standard deviation is  . If we measure the risk by the ratio of the standard deviation on the mean, we obtain   which increases very quickly with  .

Suppose now that a project is affected only by events of the first type. Many random events   can influence the current profit   during a time interval  . Each event   if it occurs increases   by an amount   if it is a receipt and   if it is a cost. We assume that the events   have probabilities   and that they are independent. The current profit   during   is then a sum of random variations  . According to the central limit theorem, if these variations are very numerous, small compared to their sum and independent, the distribution of probabilities of this sum   is a normal law. Let   be its mean and   its variance. If the project environment is constant,   and   do not depend on  . On a duration  , the profit   follows a normal distribution with mean   and variance  . The ratio of the standard deviation on the average is   and approaches zero when   is large.

Over long periods of time, the risk caused by events of the second type tends to dominate that of events of the first type. To evaluate the risks we can therefore often ignore events of the first type, which leads us to retain a log-normal distribution. But this rule is not universal. If the risks associated with events of the first type are important, they should not be ignored, especially if the time considered is short.

All the assumptions that justify the normal distributions of   or log-normal of   are a priori very doubtful. The   and the   are not necessarily small compared to their sum because a single event can have a great influence on the success or failure of a project. Nor are they necessarily independent, because failure can lead to more failures or more success, or failure can precede success by resilience, or success can lead to failure, because greatness sometimes precedes the fall. Moreover, there is generally no reason to assume that the probabilities   are constant over time, because economic events depend on circumstances that vary. In fact, there is usually no reason that these probabilities can be properly defined because economic events are never exactly reproducible. The real economy can be very different from the casino economy. This is just a mathematical model that can help us understand reality but can also mislead us.

For a log-normal distribution, the ratio   of the standard deviation on the mean is not necessarily a good indicator of the risk , especially when the distribution is very flattened, for values ​​of  . In general, one prefers  , which is also an indicator of the dispersion of expected values ​​around the mean.   is the standard deviation of the logarithmic yield. It is called volatility. If time is measured in years,   is the annual volatility.

In this section we have reasoned on the value of a project but we could have kept the same reasoning on the prices on the stock market. In this case the log-normal distribution is a fairly good approximation, but it slightly underestimates the probabilities of large deviations from the mean (Luenberger 1997).

To reason more easily, we will make several simplifying hypotheses in the following:

  • Stock price changes are always represented by log-normal distributions whose parameters   and   parameters do not vary.
  • We reason on stocks that do not pay dividends. The profits are therefore only the capital gains. This amounts to assuming that the paid dividends are systematically reinvested.
  • Inflation is ignored. This means that we reason on the real values ​​and not on the nominal ones.
  • Transaction costs and taxes are ignored.
  • We assume that there is a single risk-free interest rate. We therefore ignore its term structure. Above all, we ignore that even the "risk free" interest rate is risky because even if there is no risk of default by the borrower, there is always a risk of inflation.

These simplifying hypotheses make it possible to concentrate the reasoning on some of the most important points, but if we want to apply the conclusions to the real world, we must of course be aware of the complications that the theory ignores.

Arithmetic, logarithmic and average yields edit

Arithmetic yield, or simply yield, is the rate of profit of an asset. If   is its initial value and   its final value, the profit is   and the profit rate is   therefore  

The logarithmic yield is   therefore  

When  ,  

The logarithmic yield is more convenient than the arithmetic yield when one has to compose yields for successive periods:

 

while

 

Arithmetic yield is more convenient than logarithmic yield when calculating a portfolio yield:

 

where the   are the initial values ​​of the   assets that make up the portfolio and   their respective yields.   is the weight of the asset   in the portfolio.

 

When   is a random variable, the average of logarithmic yield is not the logarithmic yield calculated from the average profit, that is why the logarithmic average yield   is defined not by the average of logarithmic yield but by the logarithm of the ratio between the average final value and the initial value:

 

If   has a log-normal distribution with parameters   and  , the logarithmic average yield is   because   but the average of logarithmic yield is  , because   has a normal distribution with mean  . The standard deviation of the logarithmic yield is  . It measures the dispersion of the logarithmic yield around its mean   not around the logarithmic average yield   but the difference is often quite small. For a risky asset   and   are typical values ​​for the annual logarithmic yield, and  

The evolution of the expected value of an asset edit

It is assumed that the changes in the price of an asset are random and are described by the lognormal distribution presented above.

If   is the present value of the asset, its future value   on date   has a log-normal probability density :

 

The average, or expected value, of future prices is

 

The Capital Asset Pricing Model edit

The Capital Asset Pricing Model (CAPM) is a simplified model that shows how idealized financial markets could evaluate risk premiums. The main lesson of this model is that a risk premium does not depend on the standard deviation of the value of an asset but on its covariance with the general economic conditions. This measures a non-eliminable risk while the standard deviation includes a risk eliminable by diversification.

If all economic projects were statistically independent, we could always eliminate their risks through diversification. A mutual fund could be an almost risk-free portfolio from a very large number of risky assets. Since the risk is almost eliminated, its cost would be negligible and the risk premiums would be almost zero. All risky projects would then be attractive as soon as their yield is at least the risk-free interest rate. But economic projects are not usually independent. On the contrary, they are generally dependent on the same economic conditions, because all the agents are sensitive to general prosperity or its absence, so they are generally correlated with each other. It is not always possible to eliminate risk by diversification. Risky projects whose risk can not be eliminated must have a higher average yield. The Capital Asset Pricing Model measures non-eliminable risks and the risk premiums they generate. It is based on some simplifying assumptions:

  • Agents always measure the performance of a portfolio based on its average yield, and the risk based on the standard deviation of that yield. They are all equally informed about average asset yields, their standard deviations and their covariances.
  • They can lend and borrow at the risk free rate freely and without cost.
  • They can always build a diversified portfolio. All weighted sums of assets are potential portfolios.

The half-line of optimal portfolios edit

Let   be a yield (arithmetic, not logarithmic) higher than the risk-free interest rate  . Let   be the set of all risky portfolios that have the same average yield. Let   be the standard deviation of the yield of an optimal portfolio of  : for any portfolio in   the standard deviation of its yield is greater than or equal to  . Then the half-line of optimal portfolios in the half-plane   is given by the equation:

 

All   of possible portfolios are below this half-line. All points on this half-line are optimal   of portfolios. They are the least risky for a given expected yield, and the most profitable for a given risk.

Proof: Let us first show that all the points of the half-line are possible portfolios. Consider a portfolio consisting of   at the risk-free rate and   of the optimal portfolio at the rate  . Its average yield is  , the standard deviation of this yield is  , therefore it is on the half-line of the optimal portfolios. If  ,   is between   and  . If  ,  . In this case, one borrows funds at the risk-free rate   to invest them at the risky rate  , and increases the average yield by leverage.

Let   be a point above the half-line of optimal portfolios and assume that it represents a possible portfolio. By the same argument as above, the half-line that starts from   and goes through   would also represent possible portfolios. In particular   would represent a possible portfolio. Since   is above the half-line of optimal portfolios:

 

hence

 

But it is contrary to the definition of   which is the smallest of the standard deviations of the possible portfolios of the same yield  . So   can not represent a possible portfolio if it is above the half-line of optimal portfolios.

It can be concluded that:

 

for all   and   greater than  , since   and   are both on the half-line of optimal portfolios.

 

The hypothesis of optimal markets edit

The market portfolio includes in principle all the assets, risky or not, that can be traded in an economy. It includes all the wealth that can make a profit, securities or real estate, as soon as they have a market price. Its average yield depends on the prosperity of the economy. Its standard deviation represents the general risk that all agents face, because it represents the risk of a general lack of prosperity. Because the market portfolio is the most diversified, it eliminates all the risks that can be eliminated through diversification. Very diversified portfolios, such as the SP500, are also eliminating risks that can be eliminated through diversification.

The hypothesis of optimal markets postulates that the market portfolio is on the half-line of optimal portfolios.

This hypothesis is obviously wrong, since agents are not always rational when they invest their money. But as a first approximation we can assume that very diversified portfolios like the SP500 are not very different from an optimal portfolio. We then place the half-line of optimal portfolios by estimating the average yield of the SP500, or another well-diversified and well-chosen portfolio, and its standard deviation.

The covariance with the general economic conditions edit

If we assume that the market portfolio is optimal and if   is its average return,   is the standard deviation   of its yield.

The   of an asset   is by definition:

 

where   and   are the random yields of the asset   and the market portfolio respectively.

  is proportional to the covariance with the yield of the market portfolio, so with general economic conditions.

We will show that

 

where   is the average yield of the asset  .

Consider a portfolio that contains a value   of the asset   and   of an optimal portfolio with the same average return  . The yield of this portfolio is  . Let   be the variance of its yield. Since   is minimal at  ,   .

Let   be the random yield of the asset   and   the random yield of the optimal portfolio with the same average return.

 

 

 

 

hence

 

The portfolio with yield   can consist of   of the market portfolio and   of a risk-free asset. So

 

Now

 

Therefore

 

  measures the risk which cannot be eliminated by diversification edit

We define the random variable   by

 

Then

 

 

 

The variance of   is the sum of two terms.   represents a risk that can not be eliminated by diversification.   represents the risk that can be eliminated by diversification, because it is the variance of a random variable that is not correlated with the market portfolio.

The risk premium depends only on the covariance with the general economic conditions edit

The risk premium of an asset   is the present value of the surplus profit required to offset its risk. It is obtained from the required surplus profit rate  . Since  , the risk premium of an asset   depends only on   therefore only on the covariance with the general economic conditions.

If  , the risk premium of the asset   is zero. It is possible that this asset is also very risky, with a very high  , but this risk can be eliminated by diversification with other assets whose   is zero. That is why the risk premium is zero.

When   is negative edit

If   is negative,  . Why agree to hold the risky asset   when it exposes us on average to profits lower than the risk free profit or to losses?

The   of a portfolio is the weighted average of the   of the assets   of which it is composed, because the covariance of a sum of random variables with the same variable is the sum of their covariances with that variable. An asset   whose   is negative decreases the   of a portfolio in which it is included, so the risk non-eliminable by diversification. The decrease of the yield is offset by the decrease of the risk.

A put option is an example of an asset with negative   if the   of the underlying asset is positive, because a put option is negatively correlated with the underlying asset. The   can even be negative enough for the average yield to be negative. Such an option is more expensive to buy than it yields on average. Why then buy put options? Because they reduce the risk of a portfolio that would be very risky without them.

The three kinds of risk edit

  • If  , the risk of the asset   is positively correlated with the market. It is a risk that can not be eliminated without reducing profits.
  • If  , the risk of the asset   is decorrelated from the market and can be eliminated by diversification without reducing profits.
  • If  , the risk of the asset   is negatively correlated with the market. Anticorrelations of   with the market reduce the risk of a portfolio whose   is positive while reducing its yield.

Optimizing a portfolio edit

The CAPM can be used even if the optimal markets hypothesis is abandoned because it provides a method for optimizing a portfolio:

Having initially chosen a sensible portfolio, the SP500 for example, we begin by estimating its average yield   and its variance  . For each asset   that it does not contain, its average yield   and its covariance   with the initial portfolio are then estimated. We then calculate the   of this asset relative to the initial portfolio:

 

If   then it is valuable to incorporate the asset   in the initial portfolio. If the new assets so chosen are well diversified, this method gives a better portfolio than the initial one. It can have both higher yield and lower risk. By iterating the process, one can hope to find an optimal portfolio and beat the market.


The CAPM was introduced by Jack Treynor (1961, 1962), William F. Sharpe (1964), John Lintner (1965) and Jan Mossin (1966) independently, building on the earlier work of Harry Markowitz on diversification and modern portfolio theory. (Wikipedia)

Expected values of yields are usually not measurable edit

To measure the expected value   of a random variable   with standard deviation  , we must have at least   independent measurements.

Proof: The average   measured with   independent measurements is itself a random variable:

  where the   are independent random variables with the same law as  .

The expected value of   is obviously   and its standard deviation is

 

For the measurement to be meaningful,   must be small in front of  . With  , we can hope to have a correct estimate of   but this remains a very imprecise measurement, because there is a non-negligible probability, approximately 0.04, that   deviates from   by more than 20%.

  requires  

The annual yields of stocks are generally between 6% and 30% and sometimes lower. 12% is a typical value. The standard deviations of these yields are generally between 10% and 60%. 15% is a typical value. So   or higher. It would take more than a century of annual yield measurements to get a rough estimate of its expected value. But we do not have a century, only a few years, because there is no reason for the expected value of a yield to remain constant for more than a few years. If we measure the monthly return, we increase the number of measurements by a factor of 12 but   also increases by a factor of 12. So the conclusion is not changed. In general, expected values of yields are not measurable (Luenberger 1998).

The measured average yields are not estimates of the theoretical average yields, unless the investments are low risk, because then   is small in front of 1. This implies that a probabilistic model of a variation of yield can not be directly confronted with reality, since one can not measure its most important parameter, the expected value of the yield. This is not surprising since, in general, theoretical probabilities have no objective significance in economics, as economic events are not reproducible.

Since probabilistic models of yield variations can not be directly confronted with reality, one is tempted to conclude that they have no scientific value, but it is an exaggerated conclusion, because these models can still lead to observable predictions. They are sometimes very useful to explain our observations even if we can not measure all their parameters.

The CAPM assumes that agents make their investment choices knowing the expected values of yields. Since these are usually not measurable, agents can not know them. In fact, these expected values of yields are purely theoretical and have no real existence. But it should not be concluded that the CAPM is completely unrealistic. Agents estimate expected yields and make decisions based on their estimates. If the agents are properly informed, the expected yields may be not too bad estimates of the yields finally achieved.

Risk reduction by temporal diversification edit

Consider a very risky investment that allows one to multiply one's capital by a factor   over a short period of time with a probability   or to lose everything. Its average efficiency is  . But if we invest all our capital for   successive periods, we have a probability   of being ruined. If   is large, the ruin is almost certain and we will not have benefited from the average yield. Is it not possible to take advantage of this average yield without taking risks?

Instead of risking all our capital, we can decide to manage it dynamically and to bet each period only a fraction   on this very risky investment. At each period, the average yield is only  . We have a chance on two to multiply our capital by   and a chance on two to multiply it by  . Let   the initial value of the capital and   its value after n periods. The logarithmic efficiency after n periods   is a sum of independent random variables with mean   and variance  . When n is large, the distribution of   tends to a normal distribution with mean   and variance  .

The ratio   of the standard deviation on the mean of logarithmic yield tends to zero when n is very large. If the average of the logarithmic yield per period is positive,   then we can do a risk free profit when n is very big. If   this dynamic management strategy delivers a certain profit as soon as the number of periods is large enough.

This risk reduction strategy is based on time diversification. It assumes that profits over a given period are independent of previous periods. This reduces risk by adding risky but statistically independent profits.

The formulas of Black and Scholes edit

The formulas of Black and Scholes make it possible to calculate the present value of a European call or put option from the present value   of the underlying asset, its volatility  , the time   to maturity, the option's strike price  , and the risk-free interest rate  .

The easiest way to demonstrate them is to reason on a risk-neutral economy. It means that risk premiums are always zero. This hypothesis is obviously completely false but very surprisingly it leads to correct formulas. The Black and Scholes equation presented below does not require the hypothesis of risk neutrality and justifies the formulas of the same name. More generally, the assumption of risk neutrality often makes it possible to correctly evaluate derivative products which are nevertheless very risky, because these products are valued on the basis of the present prices of their underlying assets. These market prices take into account the required risk premiums. If risk premiums change, because agents are more afraid of risk for example, market prices also change, but their relation with the prices of derivatives does not change (Hull 2011). This is why risk premiums can often be ignored when valuing derivative prices from the underlying prices. The binomial tree model presented later allows to justify this more clearly.

Risk neutrality and value of an asset edit

It is assumed that agents are risk neutral. The present value of an asset is then equal to the average of the present values of its anticipated values:

 

where   is the risk-free interest rate. We deduce for a stock whose price variations are determined by a log-normal distribution with parameters   and   :

 

Hence

 

The present value of a European call option edit

If   is the anticipated value of the underlying asset,   is the anticipated value   of a call option whose strike price is  . Risk neutrality requires that its present value   is the average of the present values of its anticipated values:

 

 

 

With  ,  ,  

 

Now  

Hence

 

since  

With  ,  

 

Let   be the cumulative distribution function of the standard normal law:

 

Since  

 

 

With  ,  

 

 

Finally

 

This is the Black and Scholes formula for European call options.

The present value of a European put option edit

If   is the anticipated value of the underlying asset,   is the anticipated value   of a put option whose exercise price is  . Risk neutrality requires that its present value   is the average of the present values of its anticipated values:

 

 

 

 

 

 

 

Finally

 

This is the Black and Scholes formula for European put options.

The Black and Scholes equation edit

In principle, risk hedging strategies can be used to build risk-free portfolios with options and shares or other assets. The technique is simply to compensate for increases and decreases. Any increase above the risk-free rate for one or more items in the portfolio is offset by a decrease in other items, or a lower increase than the risk-free rate. Such a portfolio is therefore remunerated at the risk-free rate. Increases and decreases compensate mechanically. But risk-free portfolios are the same in an economy that pays risk premiums as in an economy that does not pay for them, and the Black and Scholes formulas determine their composition. Different formulas would necessarily lead to portfolios without risk of different compositions. Since risk-free portfolios are the same whether or not the economy is risk neutral, the validity of the Black and Scholes formulas does not depend on the existence of risk premiums.

More precisely, we will show from the existence of risk-free portfolios that the function that determines the value of an option must satisfy a partial differential equation, the Black and Scholes equation. The formulas of the same name are the only solutions in this equation that satisfy the boundary conditions.

Let   be the value of an option based on the current price   of the underlying asset, at time  .   can be known empirically if it is a market price. A priori it could depend on risk premiums, because buying and selling options are risky transactions. Black and Scholes reasoning about a risk-free portfolio shows that   is in fact independent of risk premiums.

A risk-free portfolio is created at time   by holding an option and   units of the underlying. If   the underlying asset must be sold short.

As before, we assume that the random variations of the underlying asset are described by a log-normal distribution.

The   variation of   during a time interval   is the sum of two terms:

 

where   is a standard normal random variable.

To compute  , the formula   is not appropriate, because   diverges when   tends to zero.

The following reasoning on orders of magnitude is not rigorous but it leads to an exact formula, which can be proved with Ito's lemma.

 

 

The first two terms are negligible compared to the third when   tends to zero.

Assuming that we can replace   with its average value   we obtain:

 

The change in value of the risk-free portfolio is

 

The random term   has disappeared. This confirms that the portfolio is risk free.

  must vary at the risk-free rate  :

 

We obtain

 

This is the Black and Scholes equation:

 

One can verify that the formulas of Black and Scholes are solutions of the equation of the same name. This equation does not require the hypothesis of a risk-neutral environment. The formulas of Black and Scholes are therefore true in an environment that is not indifferent to risk. The binomial tree method provides a simpler explanation of this result.

Binomial trees and risk neutrality edit

The following examples are very simple and very unrealistic, but they are sufficient to understand why the relation between option and stock prices does not depend on risk premiums:

It is assumed that an action worth 100 today can be 110 or 90 after one period with the probabilities p and 1-p respectively. One wonders about the present price P of a put option whose exercise price is 110. It is assumed for simplicity that the risk-free interest rate is zero. The present price of a portfolio that contains an action and an option is 100 + P. Its future value is 110 in all cases. It is therefore risk free. We deduce that P = 10. We do not need to know the probability of a rise to know the price of the option. We do not need to know the risks taken by investors and their risk premiums.

More generally, a single period binomial tree is defined by the following parameters: p, u, d and r. p is the probability that the price of the stock is multiplied by u (up) after one period, 1-p the probability that it is multiplied by d (down). r is the risk-free interest rate over one period.

It is assumed that the present price of the action is 100, that u> 1 and d <1. To evaluate the present price P of a put option whose exercise price is K, we reason on a portfolio that contains   shares and one option. We assume that  . The current price of the portfolio is  . Its future value is either   or  . This portfolio is risk free when

 

that is to say

 

Since it is safe, one must have

 

so

 

To find out the present price C of a call option whose exercise price is K, we think about a portfolio consisting of having sold   shares short and having bought an option. Selling short is selling shares that have been borrowed by committing to buy them later to return them. The current price of the portfolio is  . Its future value is either   or  . This portfolio is risk free when

 

that is to say

 

Since it is safe, one must have

 

so

 

As with the first example, we do not need to know the probability p of a rise to know the price of the options. So we do not need to know the risk premiums to evaluate the put and call options.

It is of course perfectly unrealistic to assume that a share can only have two values ​​after one period. But it is enough to reason on multiperiod binomial trees to make the model very realistic, as soon as the number of periods is large enough. With two periods, three possible future values ​​are obtained: 100uu, 100ud, and 100dd. With N periods, we obtain N + 1 possible future values. If N is very large, the variations of the share price follow a log-normal law. We can prove the formulas of Black and Scholes by reasoning on binomial trees. The independence of the price of options with respect to risk premiums established with binomial trees is therefore much more realistic than what the simplicity of the model suggests at the outset.

 


The article by Cox, Ross and Rubinstein, Option pricing, a simplified approach (1979) is the pioneering article that showed the value of this model.

The average yield of a put option may be negative edit

A put option has a negative   if the   of the underlying stock is positive. We show on an example that the   can be negative enough for the average yield to be negative:

Consider a stock whose average yield (arithmetic annual) is 10% and volatility 20%:

 

 

 

We reason on a a six-month put option whose strike price is equal to the current price of the share plus its average yield.

Let   be the present price of the action. The strike price of the option is

 

The present price of the option is obtained with the formula of Black and Scholes:

 

With  ,  ,

The option will yield   on average on the day of exercise:

 

 

The average annual logarithmic yield of the option is therefore

 

Mathematical supplements edit

The normal law edit

Probability density edit

  • A random variable   follows a standard normal law when its probability density is:

 

  is a normalization factor for the sum of probabilities to be equal to one:

 

It is proved by the following reasoning:

 

 

hence  

With  ,  , we get  

hence

 

  • A random variable   follows a centered normal law when its probability density is:

 

With  ,  , we check that  

  • A random variable   follows a normal law when its probability density is:

 

With  ,  , we check that  

 

The red curve is the standard normal distribution.

Expected value edit

A random variable   is centered when its mean, or expected value  , is zero. It is easy to verify that centered normal laws have a zero mean since their probability densities are even.   is the integral of an odd function and is therefore zero.

With  , we obtain for the expected of the normal distribution:

 

Variance and standard deviation edit

  • We obtain the variance of a standard normal random variable   with an integration by parts:

 

  • With  ,  , we then obtain the variance of the centered normal law:

 

  • The variance of the normal distribution is identical:

 

  is therefore the standard deviation   of  .

For the normal distribution,   is also a good estimate of the mean of the absolute values of the deviations from the mean:

 

 

hence

 

The lognormal law edit

Probability density edit

Let   be a random variable such that   follows a normal law with mean   and standard deviation  .

The cumulative distribution function of   is

 

The probability density of   is therefore

 


 

Some log-normal density functions with identical parameter   but differing parameters  

Expected value edit

 

With  ,  ,  ,  

 

Now  

Hence

 

 

Variance and standard deviation edit

 

With  ,  ,  

 

Now  

Hence

 

 

 

 

The standard deviation of   is therefore